Electricity Board

Application Letter for Electricity Meter Change & Bill Correction

Auto-fill and download official Application Letter format PDF to Electricity Executive Engineer / SDO for faulty meter replacement & name change.

1 Recipient Authority / Office Details

2 Applicant Particulars

3 Application Specific Inputs (Auto-Generates Official Text)

Official Procedural Guide

Guide to Submitting Application for New Electricity Connection / Meter Replacement

Application to the Sub-Divisional Officer (SDO) or Executive Engineer at Electricity Distribution Discom (UPPCL, BSES, TNEB, MSEDCL) for replacing a burnt/faulty electricity meter or rectifying incorrect billing.

Important Instructions for Submission:

• Print this auto-filled application on standard A4 size paper.

• Sign or affix thumb impression above the Applicant Signature block.

• Attach self-attested photocopies of mandatory identity proof (Aadhaar / Voter ID).

• Retain a receiving copy stamped by the official receiving clerk at the office counter.